[1]
Diem, C.H. 2016. Studying a solution for improving the working effectiveness of transferring altitudes via vertical shafts to tunnels when building big-depth tunnels. Journal of Geodesy and Cartography. 30 (Dec. 2016), 50–54. DOI:https://doi.org/10.54491/jgac.2016.30.201.