Diem, C. H. (2016). Studying a solution for improving the working effectiveness of transferring altitudes via vertical shafts to tunnels when building big-depth tunnels. Journal of Geodesy and Cartography, (30), 50–54. https://doi.org/10.54491/jgac.2016.30.201