Abstract
In underground construction, the lateral error of cut-through play an important role. The value of this error is depended on the quality of control network on the earth surface. The GPS/GNSS control network is more and more applied for underground construction, however, until now there is no standardized procedure on its establishment. The research results on the GPS/GNSS control network establishment procedure have been presented in this paper.
PDF (Tiếng Việt)
| Download: 414
Downloads
Download data is not yet available.