Characteristic of job on establishment for control net-Wwork and observation network in horizontal movement observation of ydropower project in Vietnam
PDF (Tiếng Việt) | Download: 55

Working Languages

How to Cite

Phung, T. A. (2010). Characteristic of job on establishment for control net-Wwork and observation network in horizontal movement observation of ydropower project in Vietnam. Journal of Geodesy and Cartography, (4), 30–33. https://doi.org/10.54491/jgac.2010.4.409

Abstract

The article’s achievement permits to evaluate the accuracy of methods to establish control networks, observation networks in horizontal movement observation of hydro power project. It is really necessary to choose an optimum solution to propose the alternative on setting up control network and horizontal movement observation network.
https://doi.org/10.54491/jgac.2010.4.409