Abstract
This paper analyses the errors in earthwork volume computation in route surveying. It also presents a new method which using EDM and designed cross sections to calculate work volume. In addition, it analyses and introduces the optimal methods depend on steps of design and terrain topographical surface.
PDF (Tiếng Việt)
| Download: 2
PDF (Tiếng Việt)
| Download: 0
Downloads
Download data is not yet available.